Project implementation process
1. Equipping and preparing the workshop
1. Equipping and preparing the workshop
Establishing offices, warehouses and equipment, fencing and securing the project environment
2. Running the candles
2. Running the candles
Execution of 40 to 50 meter perimeter piles and concreting (Bored Piles / Micropiles) – Digging piles, reinforcing and concreting according to structural drawings
3. Excavation operations
3. Excavation operations
Soil removal up to a depth of 31 meters, wall bracing with nailing and anchoring techniques, complete safety of the work environment, and maintaining the stability of the walls throughout the project
4. Foundation implementation
4. Foundation implementation
Formwork and reinforcement of foundations with engineering precision, high-quality concreting and precise control of concrete strength standards, preparation of the foundation for loading the main skeleton
5. Implementation of the main skeleton and structure
5. Implementation of the main skeleton and structure
Installing columns and beams with engineering precision, concreting roofs and implementing retaining walls, ensuring full compliance with drawings and international standards
1. Equipping and preparing the workshop
Establishing offices, warehouses and equipment, fencing and securing the project environment
2. Running the candles
Execution of 40 to 50 meter perimeter piles and concreting (Bored Piles / Micropiles) – Digging piles, reinforcing and concreting according to structural drawings
3. Excavation operations
Soil removal up to a depth of 31 meters, wall bracing with nailing and anchoring techniques, complete safety of the work environment, and maintaining the stability of the walls throughout the project.
4. Foundation implementation
Formwork and reinforcement of foundations with engineering precision, high-quality concreting and precise control of concrete strength standards, preparation of the foundation for loading the main skeleton
5. Implementation of the main skeleton and structure
Installing columns and beams with engineering precision, concreting roofs and implementing retaining walls, ensuring full compliance with drawings and international standards